Results 1 to 10 of 10

Thread: rebuild??

  1. #1
    Ride
    VN calais 5ltr

    Join Date
    Jun 2006
    Location
    melbourne
    Posts
    16

    Default rebuild??

    hey fellas my car has done about 390000 k's. its runs good and doesnt blow smoke but thats heaps of k's. im thinking of rebuilding. i got a quote $2500 and 2 and a half weeks to do. is this good or how much is good? and what should i be looking for? thanx for the help.

  2. #2
    Ride
    VZ LS1 Calais

    Join Date
    Dec 2005
    Location
    South Brisbane
    Posts
    2,933

    Default

    that sounds alright man...but whats getting done for that $2500? make sure they re-hone the block and heads and do all other usual machining...not just rip the engine apart and put it back together with some new bearings and gaskets.

  3. #3
    Ride
    VR SS manual

    Join Date
    Apr 2006
    Posts
    134

    Default

    how long have u had it for?? sure it hasnt had a rebuild down the line

    get a compression test done etc could save u money if its still all in GC

  4. #4
    Full Spectrum's Avatar
    Full Spectrum is offline Customize your life.
    Ride
    2000 Berlina V6.

    Join Date
    Dec 2003
    Location
    Melbourne's West.
    Posts
    2,389
    Blog Entries
    1

    Default

    Sounds great i was quoted $3000.
    But i have herd of my brothers mate getting a change over VL 6T for $1,700.
    Quote Originally Posted by Yoda
    Do, or do not. There is no 'try'.
    <img src=http://forums.justcommodores.com.au/signaturepics/sigpic440_66.gif border=0 alt= />

  5. #5
    Ride
    VN Commodore

    Join Date
    Feb 2006
    Posts
    1,286

    Default

    most of the rebilding is labor. me and a mate rebuilt his girlfriends 5L. i forgot how much it cost in parts, but it wasn't much. he just got a new set of rings and bearings. took the motor to repco and got it dipped and got them to put the new cam bearings in as it is a shit of a job and i think ya need a special tool.
    and ya would have to be a very bad mechanic to not hone a motor before putting rings in it..
    i would be doing a comp test for sure. don't rebuild it if it doesn't need it.

  6. #6
    Ride
    VN calais 5ltr

    Join Date
    Jun 2006
    Location
    melbourne
    Posts
    16

    Default

    yer the 2500 was machined and stuff. how much is a comp test? and does the average mechanic do it? and i only just brought it so i wouldnt have a clue if it has had a rebuild already.

  7. #7
    anton1o's Avatar
    anton1o is offline [GMHVN6]
    Ride
    VN 6 Berlina '90

    Join Date
    Jan 2005
    Location
    West Subs,Melbourne
    Posts
    367

    Default

    If your going to re-build it, get yourself a few goodies to put in at the same time.. Altho its getting a rebuild, And at that price a cam wouldnt go astray

    But thats how i would do it.. A rebuild should revive the car back to Its earlier days but a bit of performance will really show you whos boss
    ride; [GMHVN6] Project Streeter - VN Berlina '90 mods; 65mm throttle-body / Cold Air Intake / 8mm Ignition Leads / Exhaust
    future; Extractors , Cam currently; 101.2rwkw mission; 110rwkw

  8. #8
    38VNIT's Avatar
    38VNIT is offline Azerium
    Ride
    nothing

    Join Date
    Jul 2006
    Location
    Inverell
    Posts
    264

    Default

    ok i have a Q, how much is an engine/trans rebuild, and would i just be better buying a crate motor and a vs gearbox??

  9. #9
    Ride
    VZ LS1 Calais

    Join Date
    Dec 2005
    Location
    South Brisbane
    Posts
    2,933

    Default

    the average cost to rebuild an engine (stock) is about $3k, a trans 'build is around $1.5k-2k...so yes, for a little extra buying a brand spanker from holden may be a better alternative if you just want a reliable fresh engine and box.

  10. #10
    fazz1977's Avatar
    fazz1977 is offline myspace.com/fazz_himself
    Ride
    1992 VP Executive Wagon, L27 V6 3800

    Join Date
    Aug 2005
    Location
    Frankghanistan, Melbourne, VIC
    Posts
    686

    Default

    I got quoted $1650 for a newbie when it may have looked as if it was needed.
    Life's Grouse in Frankston South!

Similar Threads

  1. V6 Rebuild(VR)
    By lgnd3800 in forum V6 Development And Modification
    Replies: 9
    Last Post: 29-06-2006, 03:16 PM
  2. V6 Rebuild(VR)
    By lgnd3800 in forum VR - VS Holden Commodore (1993 - 1997)
    Replies: 6
    Last Post: 07-06-2006, 08:45 PM
  3. 308 rebuild for gas
    By smeghead in forum VB - VK Holden Commodore (1978 - 1985)
    Replies: 1
    Last Post: 05-09-2005, 01:26 PM
  4. To rebuild or not to rebuild!? advice needed
    By Jason1987 in forum VL Holden Commodore (1986 - 1988)
    Replies: 12
    Last Post: 04-08-2005, 08:36 PM
  5. 202 rebuild
    By NVE_069 in forum VB - VK Holden Commodore (1978 - 1985)
    Replies: 4
    Last Post: 20-07-2005, 07:20 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72