I'm pretty sure I've decided on W2A. I'll see how it goes for awhile anyway. Might give me a bit of a barrier as to how far I can go/how much money I can waste lol.
Did the porting myself, so only cost the price of some angle grinder cutting blades.
It's nothing major, just blower and LIM port matched to the gasket. Was going to go a bit further and open up the intake, but didn't want to damage anything. Maybe next time.
Yeah, LIM gaskets are the alloy ones from MACE/ZZP etc, thought I may as well get them, considering it was all apart and I was getting stuff from ZZP anyway.
Took it for a wheel alignment last week, to try and sort out a vibration issue. The camber on the back wheels was ridiculous. Turned out it had adjustable bushes , but only on the drivers side. Got a new 4 point kit put in, sitting great now, and also sorted out 99% of the vibrations.
Going to change the steering rack over for a non-Variable Ratio one. Variable one is too big, and the clutch cable is melting on the extractors, because it's pretty much jammed in there.
Hopefully get the VT brakes and master cylinder on this week, along with the power steering rack, and aim for getting the engineers report ticked off next week, then get it rego'ed the week after. Personalised plates or not?
So that's where it's at at the moment.
Cheers,
Brendan