Deuce
Super Stock
- Joined
- Feb 5, 2012
- Messages
- 4,491
- Reaction score
- 4,720
- Points
- 113
- Location
- Snobs Rock (or so the locals say)
- Members Ride
- '94 VR SS V8
2nd row doors are finished. Handles are in, catches on the body, hinge pins tightened and locked.
All LH glazing is sorted for now. RH is good, put a bag over the drivers window just for transport reasons.
All LH glazing is sorted for now. RH is good, put a bag over the drivers window just for transport reasons.
Last edited: