Anyone considering doing up their VP or have their project already under way? Eddie
FXST01 The Grey Man Joined Jun 3, 2005 Messages 1,109 Reaction score 52 Points 48 Location Perth, WA Members Ride VP V6 Exec Jun 16, 2022 #1 Anyone considering doing up their VP or have their project already under way? Eddie
NORTI Well-Known Member Joined May 22, 2004 Messages 3,418 Reaction score 5,109 Points 113 Location Radelaide Members Ride Wildtrak Jun 17, 2022 #2 its in pieces. that's as far as its got so far
Chippa New Member Joined Jun 2, 2006 Messages 21 Reaction score 1 Points 3 Age 37 Location Korumburra vic Members Ride Vp ss supercharged, VE SSV 6 speed wagon 280rwkw Jul 17, 2022 #3 yeah i'm in the middle of doing up my VP SS thats been parked up for 8 years or there abouts
gtrboyy Well-Known Member Joined Jan 25, 2006 Messages 4,290 Reaction score 2,808 Points 113 Members Ride vt ss & lc gtr Jul 17, 2022 #4 Vp v8 ute still on the go...looks more stock & crappier than the day I bought it lol Nobody even notices it's modified untill they drive it.
Vp v8 ute still on the go...looks more stock & crappier than the day I bought it lol Nobody even notices it's modified untill they drive it.
NORTI Well-Known Member Joined May 22, 2004 Messages 3,418 Reaction score 5,109 Points 113 Location Radelaide Members Ride Wildtrak Jul 19, 2022 #5 Mine is going to sit in pieces for longer, as we switched to pulling down the other halves VP ute for mod and rebuild as well. VP projects in play now = 2
Mine is going to sit in pieces for longer, as we switched to pulling down the other halves VP ute for mod and rebuild as well. VP projects in play now = 2