ascottaudio
AscottAudio
- Joined
- Feb 16, 2009
- Messages
- 111
- Reaction score
- 1
- Points
- 16
- Location
- Melbourne
- Members Ride
- VE Calais V8
1) Do "knee Jerk" road works like putting up the barriers on the West Gate Bridge to stop "jumpers".(I know for a fact they now jump off the Bolty bridge)..
2) Make the road works last for months if not years by using a bear minimum of man power so that traffic can be slowed for a maximum of time.
3) Put up speed signs (40k) even if there is no work being done and its perfectly fine to drive at the normal speed limit.
4) Do road works on Roads that were only just constructed in the last few years to frustrate drivers even more by making wonder why??????
5) Resurface perfectly good roads (like they did to my street) and leave bumpy pot holed roads to stuff up drivers cars.
6) Put in new traffic signals (like the red arrow they put in at my corner) ..that slow the traffic even more rather than speed it up...
ok ....feel free to add some of your own..
Cheers.
2) Make the road works last for months if not years by using a bear minimum of man power so that traffic can be slowed for a maximum of time.
3) Put up speed signs (40k) even if there is no work being done and its perfectly fine to drive at the normal speed limit.
4) Do road works on Roads that were only just constructed in the last few years to frustrate drivers even more by making wonder why??????
5) Resurface perfectly good roads (like they did to my street) and leave bumpy pot holed roads to stuff up drivers cars.
6) Put in new traffic signals (like the red arrow they put in at my corner) ..that slow the traffic even more rather than speed it up...
ok ....feel free to add some of your own..
Cheers.
Last edited: