Got a bunch of work done on the weekend... including:
- All brake lines are made up, running banjo fittings at the master cyl for more clearance for supercharger & manifold.
- The pass side brake line now runs underneath the motor and chassis rail to keep it away from the heat of the turbo.
- Engine, clutch, gearbox, tailshaft in and bolted up
- braided clutch line made up and mounted prettily
- handbrake mechanism done!
- Intercooler and engine oil cooler mounted
- Front wheel speed sensor operational (to be used for traction control)
- sourced an LPG level sender with the correct resistance to work with the VR dash cluster (i.e. LPG only, fuel gauge reads LPG level only)
- sourced power steering pump, lines, etc. for the new power steer setup
- heaps of bolts etc all now torqued up
- door strikers et al adjusted
The plan for the next couple of sessions is:
- Fit front/rear screens
- Make up an exhaust! (4" -> 3.5" with heaps of big free flowing mufflers) - it needs to sound sedate and quiet + legal when putting around and under noise test conditions, but I want it to howl when giving it berries.
- Make up supercharger manifold(s) , drive mechanism/pulleys/etc
- Bolt accessories etc to the motor
- Make up cooler piping.
- Run starter motor cable...
- general bolt tightening and heaps of little stuff....
- once all done get the guards/bonnet etc on...
- try start it? and see what happens lol