not bad for an afternoons work i think. i ended up doing the cutting and grinding, and dad welded them, i need to hone my skills more before doing something as critical as this. cut 3.75 inches of tube out to get shocks to fit, and had to thin the tube down a bit to get the sleeves over, in the end they were a tight fit, having to hammer them down 2 inches or so, then dad welded them, so theyre not going anywhere i reckon.
springs are on their way, so next is getting the spring tops machined a bit and boring out the strut top bits to fit the 14mm thread of the shock.