Well its been a long time .... Ute has been off road for few months and im getting impatient hahaha, L67 is being rebuilt and in the hands of man who knows his ****!!. here is a couple things being done to the old girl
:
Crank sent for checking and possible regrind
ARP studs,
Line Hone Main Tunnel - Petrol 4 main unit
Fit bearings and measure for crank grind
Cam Bearings
Deck block to suit MLS gaskets
Bore and hone and hot tank bath
Balance rotating mass
Gapless piston rings
Resize rods
ARP rod bolts
MLS gaskets
Head studs
Heads basic surface machine guides and performance valve job
Port blower, ADZ elbow and 85mm TB
Full tune on MAP
Along with my other bits and pieces i had XP cam, forged pistons etc + A2A intercooler will probably be installed before first start up, also trying to toss up between E85 ..... and im leaning towards it lol.
wondering how much of a struggle it will be for traction....