Just an update on the VK. Finally got the old girl down to my workshop. Have completely stripped the interior including the dash (ready for the vr unit), all seats, centre console and carpet. Got the tired old 202 and auto out. I have ended up using a VR cross member complete with brakes, suspension, sway bar and power steering rack. I ended up cutting down the hats on top of the struts to the same size as the VK and drilling the holes the same to keep the wheel alignment as close as possible. Will get a full wheel alignment when the project is finished. Everything went together great. Am hoping to have the ecotec in by the end of the week along with the fuel tank and wiring loom. Im going to run the complete loom from the VR so that everything works as it should. Even want to keep the central locking. Mesured up the dash today and they seem to be the same width so hopefully it will fit reasonably well.