Today and last night i run some of the balustrade wires. One short run wad already done by my brother a few weeks ago but i had to tension up the cables. Small job took me 5hrs or more because once the cables were tight the post started coming away from the wall. I ended up having to loosen everything back of and reanchor the post but with an extra five screws. In the end i had to add three 150mm bugals on the scew to pick up the corner of the stud because it still shifted about 5mm and is still bowing the post. Pretty much have to leave it as good enough because I don't think I can get it perfect due the amount of tension needed on the cables.